Order Search


Return Count: 17
Cause NumberOrder NumberOrder DateField CodeField NameFormationDescription
2322310-19-198190750WATTENBERGJSNDAmends Order 232 20 and allows drilling of an additional well on each 320 acre unit in the area not included in Order 232 20.
4078702-19-1992  CODL, NB-CD, NBRRApproves the request to establish spacing for the Niobrara Formation for certain lands previously spaced for the Codell Formation and to allow the downhole commingling of production from the Codell and Niobrara Formations.
407223710-30-2017  NBRRApproves Extraction Oil & Gas, LLC’s request for an order to among other things: Pool all interests in two approximate 800-acre designated horizontal wellbore spacing units (“WSU”) established for the development and operation of the Niobrara Formation.
407302002-26-2020  NB-CDAmong other things IT IS HEREBY ORDERED: An approximate 1,680-acre drilling and spacing unit for the Application Lands is hereby established, and up to 20 horizontal wells within the unit are approved for production from the Niobrara and Codell Formations, pursuant to the findings above.
407320301-13-2021  NB-CDAmong other things approves an order to to establish an approximate 800-acre drilling and spacing unit and approve up to nine horizontal wells within the unit, for production from the Niobrara and Codell Formations.
407341612-07-2022  NFCCAmong other things IT IS HEREBY ORDERED: 1. PDC’s August 1, 2022 Amended Application for the Guanella CAP is GRANTED. 2. The Commission hereby establishes an approximate 33,427-acre CAP in the Application Lands for development of oil, gas, and associated hydrocarbons from the Niobrara, Fort Hays, Codell, and Carlile Formations. Township 5 North, Range 65 West, 6th P.M. Section 30: W½ Section 31: W½ Township 5 North, Range 66 West, 6th P.M. Section 17: W½ Section 18: All Section 19: All Section 20: W½ Section 24: W½ Section 25: All Section 26: S½ Section 27: S½ Section 28: S½ Section 29: S½ Section 30: S½ Section 31: All Section 32: All Section 33: All Section 34: All Section 35: All Section 36: All Township 5 North, Range 67 West, 6th P.M. Section 13: All Section 14: All Section 23: All Section 24: All Section 25: All Section 26: All Section 35: All Section 36: All Township 4 North, Range 67 West, 6th P.M. Section 1: N½ Section 2: N½ Section 3: N½ Section 4: NE¼ Township 4 North, Range 66 West, 6th P.M. Section 1: All Section 2: All Section 3: All Section 4: All Section 5: All Section 6: E½, NW¼ Section 10: All Section 11: All Section 12: All Section 13: All Section 14: All Section 15: All Section 16: NE¼, S½ Section 17: S½ Section 18: All Section 19: All Section 20: All Section 21: All Section 22: All Section 23: All Section 24: All Section 25: All Section 26: All Section 27: All Township 4 North, Range 65 West, 6th P.M. Section 6: S½, NW¼ Section 7: All Section 18: All Section 19: All Section 30: All
407344704-19-2023  NBRRAmong other things IT IS HEREBY ORDERED: 1. Pursuant to the provisions of C.R.S. § 34-60-116, all interests in the drilling and spacing unit established for the Application Lands are hereby pooled, for the development and operation of the Niobrara Formation, effective as of the date the Application was filed. 2. The production obtained from the drilling and spacing unit shall be allocated to each owner in the unit on the basis of the proportion that the number of acres in such tract bears to the total number of mineral acres within the drilling and spacing unit; each owner of an interest in the drilling and spacing unit shall be entitled to receive its share of the production of the Wells located on the drilling and spacing unit applicable to its interest in the drilling and spacing unit. 3. The following working interest owner(s) did not elect to participate in the Well(s) or failed to make a timely election and are hereby deemed to be nonconsenting and subject to the penalties as provided for in C.R.S. § 34-60-116(7): Millen Clawson, d/b/a Socorro Energy. Township 5 North, Range 65 West, 6th P.M. Section 27: W½W½W½ Section 28: All Section 29: All Section 30: E½
407345205-04-2023  NBRRAmong other things IT IS HEREBY ORDERED: 1. Pursuant to the provisions of § 34-60-116, C.R.S., all interests in the designated horizontal wellbore spacing unit established for the Application Lands are hereby pooled, for the development and operation of the Niobrara and Fort Hays Formations, effective as of the date the Application was filed. Township 5 North, Range 65 West, 6th P.M. Section 27: SW¼SW¼ Section 28: S½S½ Section 29: S½S½ Section 30: S½SE¼ Section 31: N½NE¼ Section 32: N½N½ Section 33: N½N½ Section 34: NW¼NW¼
407348307-19-2023  NBRRAmong other things IT IS HEREBY ORDERED: 1. Pursuant to the provisions of C.R.S. § 34-60-116, all interests in the designated horizontal wellbore spacing units established for the Application Lands are hereby pooled, for the development and operation of the Niobrara Formation, effective as the date the Application was filed. Township 5 North, Range 65 West, 6th P.M. Section 19: S½SE¼ Section 20: S½S½ Section 21: S½S½ Section 22: SW¼SW¼ Section 27: NW¼NW¼ Section 28: N½N½ Section 29: N½N½ Section 30: N½NE¼
407350509-06-2023  NBRRAmong other things IT IS HEREBY ORDERED: Pursuant to the provisions of C.R.S. § 34-60-116, all interests in the horizontal wellbore spacing units established for the Application Lands are hereby pooled, for the development and operation of the Niobrara Formation, effective as of the date the Application was filed. Township 5 North, Range 65 West, 6th P.M. Section 29: S½S½ Section 30: S½SE¼ Section 31: N½NE¼ Section 32: N½N½
407362206-12-2024  NFCCAmong other things IT IS HEREBY ORDERED: 1. An Oil and Gas Development Plan is hereby approved for the Application Lands and 40 new horizontal wells are hereby authorized within the Application Lands, to be drilled on Applicants leasehold interest, for the production of oil, gas, and associated hydrocarbons from the Niobrara, Fort Hays, Codell, and Carlile Formations. 2. Applicant is subject to the findings made and approval of Order Nos. 407-3623, 407-3624, 407-3625, 407-3626, 407-3627, 407-2628, attached to this Order as Exhibits 6-11, which established one approximate 2,580-acre drilling and spacing unit, one approximate 360-acre wellbore spacing unit, one approximate 300-acre wellbore spacing unit, one approximate 1,280-acre drilling and spacing unit, and two approximate 240-acre wellbore spacing units, for the Application Lands, and approved up to 40 horizontal wells within the units, and were approved by the Commission on June 12, 2024. Surface Lands: Township 4 North, Range 66 West, 6th P.M. Section 1: NE¼SE¼ Blackburn Federal 4N66W1 1-16 Pad (Location ID 487263)  15.9 acres Township 5 North, Range 66 West, 6th P.M. Section 36: SE¼SW¼ Township 4 North, Range 66 West, 6th P.M. Section 1: NE¼NW¼ Capitol 1-8 Pad (Location ID 487264)  12.1 acres total Township 4 North, Range 66 West, 6th P.M. Section 3: SE¼NE¼ Oxford 4N66W3 1-16 Pad (Location ID 487262)  21.5 acres Mineral Development: Township 4 North, Range 65 West, 6th P.M. Section 6: NW¼ Township 4 North, Range 66 West, 6th P.M. Section 1: NE¼; E½E½E½NW¼ Township 5 North, Range 66 West, 6th P.M. Section 24: W½ Section 25: All Section 36: All Township 5 North, Range 65 West, 6th P.M. Section 30: W½ Section 31: W½ Blackburn-Capitol Drilling and Spacing Unit (Blackburn-Capitol DSU) DSU No. 1  approx. 2,580 acres Township 4 North, Range 65 West, 6th P.M. Section 6: E½E½NW¼; W½W½W½NE¼ Township 5 North, Range 65 West, 6th P.M. Section 30: E½E½W½; W½W½W½E½ Section 31: E½E½W½; W½W½W½E½ Blackburn Wellbore Spacing Unit (Blackburn WSU) WSU No. 2  approx. 300 acres Township 5 North, Range 66 West, 6th P.M. Section 23: E½E½E½E½ Section 24: W½W½W½ Section 25: W½W½W½ Section 26: E½E½E½E½ Section 35: E½E½E½E½ Section 36: W½W½W½ Capitol Wellbore Spacing Unit (Capitol WSU) WSU No. 3  approx. 360 acres Township 4 North, Range 66 West, 6th P.M. Section 2: W½ Section 3: All Section 4: E½ Oxford Drilling and Spacing Unit (Oxford DSU) DSU No. 4  approx. 1,280 acres Township 4 North, Range 66 West, 6th P.M. Section 2: N½N½NW¼ Section 3: N½N½N½ Section 4: N½N½NE¼ Township 5 North, Range 66 West, 6th P.M. Section 33: S½S½S½SE¼ Section 34: S½S½S½S½ Section 35: S½S½S½SW¼ Oxford N Wellbore Spacing Unit (Oxford N WSU) WSU No. 5  approx. 240 acres Township 4 North, Range 66 West, 6th P.M. Section 2: S½S½SW¼ Section 3: S½S½S½ Section 4: S½S½SE¼ Section 9: N½N½N½NE¼ Section 10: N½N½N½N½ Section 11: N½N½N½NW¼ Oxford S Wellbore Spacing Unit (Oxford S WSU) WSU No. 6  approx. 240 acres
407362506-12-2024  NFCCAmong other things IT IS HEREBY ORDERED: 1. The approximate 300-acre wellbore and spacing unit is hereby established, and one horizontal well is approved within the unit, for the production of oil, gas, and associated hydrocarbons from the Niobrara, Fort Hays, Codell, and Carlile Formations. Township 4 North, Range 65 West, 6th P.M. Section 6: E½E½NW¼; W½W½W½NE¼ Township 5 North, Range 65 West, 6th P.M. Section 30: E½E½W½; W½W½W½E½ Section 31: E½E½W½; W½W½W½E½
407365209-18-2024  NFCCAmong other things IT IS HEREBY ORDERED: 1. Pursuant to the provisions of C.R.S. § 34-60-116, all interests in the designated horizontal wellbore spacing unit established for the Application Lands are hereby pooled, for the development and operation of the Niobrara, Fort Hays, Codell, and Carlile Formations, effective as of the earlier of the date of the Application, or the date that any of the costs specified in C.R.S. § 34-60-116(7)(b)(II), are first incurred for the drilling of the Wells. Township 4 North, Range 65 West, 6th P.M. Section 6: E½E½NW¼, W½W½W½NE¼ Township 5 North, Range 65 West, 6th P.M. Section 30: E½E½W½, W½W½W½E½ Section 31: E½E½W½, W½W½W½E½
407370204-02-2025  NFCCAmong other things IT IS HEREBY ORDERED: 1. Pursuant to the provisions of C.R.S. § 34-60-116, all interests in the drilling and spacing unit established for the Application Lands are hereby pooled, for the development and operation of the Niobrara, Fort Hays, Codell, and Carlile Formations, effective as of the earlier of the date of the Application, or the date that any of the costs specified in C.R.S. § 34-60-116(7)(b)(II), are first incurred for the drilling of the Wells. 2. The production obtained from the drilling and spacing unit shall be allocated to each owner in the unit on the basis of the proportion that the number of acres in such tract bears to the total number of mineral acres within the drilling and spacing unit; each owner of an interest in the drilling and spacing unit shall be entitled to receive its share of the production of the Wells located on the drilling and spacing unit applicable to its interest in the drilling and spacing unit. Township 4 North, Range 65 West, 6th P.M. Section 6: NW¼ Township 4 North, Range 66 West, 6th P.M. Section 1: NE¼; E½E½E½NW¼ Township 5 North, Range 66 West, 6th P.M. Section 25: All Section 36: All Township 5 North, Range 65 West, 6th P.M. Section 30: W½ Section 31: W½
407370304-02-2025  NFCCAmong other things IT IS HEREBY ORDERED: 1. Order No. 407-3622 is hereby amended to remove the W½ of Section 24 and the E½E½E½E½ of Section 23, Township 5 North, Range 66 West, 6th P.M. and to approve an approximate 3,895.9-acre Raton Oil and Gas Development Plan; 2. The approximate 2,580-acre Blackburn-Capitol DSU established by Order No. 407-3623 is hereby amended to remove the W½ of Section 24, Township 5 North, Range 66 West, 6th P.M. and to establish an approximate 2,260-acre drilling and spacing unit for the development and operation of 22 horizontal wells in the Niobrara, Fort Hays, Codell, and Carlile Formations; 3. The approximate 360-acre Capitol 01N WSU established by Order No. 407-3624 is hereby amended to remove the E½E½E½E½ of Section 23 and the W½W½W½ of Section 24, Township 5 North, Range 66 West, 6th P.M. and to establish an approximate 240-acre wellbore spacing unit for the development and operation of one horizontal well in the Niobrara, Fort Hays, Codell, and Carlile Formations; Blackburn-Capitol DSU: Township 4 North, Range 65 West, 6th P.M. Section 6: NW¼ Township 4 North, Range 66 West, 6th P.M. Section 1: NE¼; E½E½E½NW¼ Township 5 North, Range 66 West, 6th P.M. Section 24: W½ [requested to be removed] Section 25: All Section 36: All Township 5 North, Range 65 West, 6th P.M. Section 30: W½ Section 31: W½ Capitol 01N WSU: Township 5 North, Range 66 West, 6th P.M. Section 23: E½E½E½E½ [requested to be removed] Section 24: W½W½W½ [requested to be removed] Section 25: W½W½W½ Section 26: E½E½E½E½ Section 35: E½E½E½E½ Section 36: W½W½W½
493205-21-1991  SUSXApproves the request to establish 80 acre drilling and spacing units for certain lands for production from the Sussex formation and further to allow the downhole commingling of production from the Sussex formation with production from the Codell and Niobrara formations
4991511-16-199290750WATTENBERGDKTAApproves the Commission motion to establish 320-acre drilling and spacing units for certain lands previously not spaced in the lands covered by Cause No. 232, for production from the Dakota Formation, to provide for procedures to obtain exceptions to the permitted well locations and to allow the recompletion and downhole commingling of production from the Dakota, "J" Sand, Codell, Niobrara, Sussex and Shannon Formations.