Order Search


Return Count: 6
Cause NumberOrder NumberOrder DateField CodeField NameFormationDescription
4078702-19-1992  CODL, NB-CD, NBRRApproves the request to establish spacing for the Niobrara Formation for certain lands previously spaced for the Codell Formation and to allow the downhole commingling of production from the Codell and Niobrara Formations.
40788810-28-2013  NB-CDApproves the request for an order to pool all interests in an approximate 320-acre designated wellbore spacing unit established for certain lands in Section 6, Township 6 North, Range 64 West, 6th P.M., for the development and operation of the Codell-Niobrara Formation.
407296311-20-2019  NFCCAmong other things: an approximate 1,864.52-acre drilling and spacing unit for the Application Lands is hereby established, and a total of up to 16 horizontal wells (with no more than 14 horizontal wells to be completed in the Codell Formation) within the unit are approved, for the production of oil, gas and associated hydrocarbons from the Niobrara, Fort Hays, Codell, and Carlile Formations.
407338309-28-2022  NFCCAmong other things IT IS HEREBY ORDERED: 1. An Oil and Gas Development Plan is hereby approved for the Application Lands and, up to 36 horizontal wells are hereby authorized within the Application Lands, to be drilled on Applicant’s leasehold interest, for the production of oil, gas, and associated hydrocarbons from the Niobrara, Fort Hays, Codell, and Carlile Formations. 2. Applicant is subject to the findings made and approval of Order No. 407-3384, attached to this Order as Exhibit 8, which reduced the setbacks in one approximate 1,222.80-acre drilling and spacing unit, two approximate 1,280-acre drilling and spacing units, and one approximate 1,864.52-acre drilling and spacing unit for the Application Lands, and approved up to 36 horizontal wells within the units, and was approved by the Commission on September 28, 2022. Surface Lands: Township 6 North, Range 64 West, 6th P.M. Section 7: NE¼NE¼ A07-01 Pad (Location ID 583510) – 13 acres Township 6 North, Range 64 West, 6th P.M. Section 7: Lot 1 A07-04 Pad (Location ID 483509) – 10.4 acres Township 6 North, Range 64 West, 6th P.M. Section 7: NE¼SE¼ A07-23 Pad (Location ID 483512) – 8.4 acres Township 6 North, Range 64 West, 6th P.M. Section 18: NE¼SE¼ A18-09 Pad (Location ID 483511) – 10.4 acres Township 6 North, Range 64 West, 6th P.M. Section 7: SE¼NE¼ A07-08 Facility (Location ID 483513) – 6.2 acres Mineral Development: Township 6 North, Range 64 West, 6th P.M. Section 7: All Section 18: All Drilling and Spacing Unit (“DSU”) No. 1 – approx. 1,222.8 acres Order No. 407-2958 Township 6 North, Range 64 West, 6th P.M. Section 8: All Section 9: All DSU No. 2 – approx. 1,280 acres Order No. 407-2959 Township 6 North, Range 64 West, 6th P.M. Section 16: All Section 17: All DSU No. 3 – approx. 1,280 acres Order No. 407-2960 Township 6 North, Range 64 West, 6th P.M. Section 5: Lot 2, S½NW¼, SW¼ Section 6: All Township 7 North, Range 64 West, 6th P.M. Section 31: All Section 32: W½ DSU No. 4 – approx. 1,864.52 acres Order No. 407-2963
407338409-28-2022  NFCCAmong other things IT IS HEREBY ORDERED: 1. Order Nos. 407-2958, 407-2959, 407-2960 and 407-2963 are hereby amended to allow the productive interval of the permitted wellbores to be located no closer than 200 feet from the unit boundaries at the heel and toe of each well, 300 feet from the unit boundaries on each lateral side of a well, and no closer than 150 feet from the productive interval of any other well producing from the same Formation, unless the Director grants an exception. 2. The proposed wells shall be drilled from the proposed A07-01 Pad (Location ID 483510), the A07-04 Pad (Location ID 483509), the A07-23 Pad (Location ID 483512), and the A18-09 Pad (Location ID 483511), with production to the A07-08 Facility (Location ID 483513), all located within the Application Lands. Township 6 North, Range 64 West, 6th P.M. Section 7: All Section 18: All Drilling and Spacing Unit (“DSU”) No. 1 – approx. 1,222.8 acres Order No. 407-2958 Township 6 North, Range 64 West, 6th P.M. Section 8: All Section 9: All DSU No. 2 – approx. 1,280 acres Order No. 407-2959 Township 6 North, Range 64 West, 6th P.M. Section 16: All Section 17: All DSU No. 3 – approx. 1,280 acres Order No. 407-2960 Township 6 North, Range 64 West, 6th P.M. Section 5: Lot 2, S½NW¼, SW¼ Section 6: All Township 7 North, Range 64 West, 6th P.M. Section 31: All Section 32: W½ DSU No. 4 – approx. 1,864.52 acres Order No. 407-2963
407359103-27-2024  NFCCAmong other things IT IS HEREBY ORDERED: 1. Pursuant to the provisions of C.R.S. § 34-60-116, all interests in the drilling and spacing unit established for the Application Lands are hereby pooled, for the development and operation of the Niobrara, Fort Hays, Codell, and Carlile Formations, effective as of the date that any of the costs specified in C.R.S. § 34-60-116(7)(b)(II) are first incurred for the drilling of the Wells. 2. The production obtained from the drilling and spacing unit shall be allocated to each owner in the unit on the basis of the proportion that the number of acres in such tract bears to the total number of mineral acres within the drilling and spacing unit; each owner of an interest in the drilling and spacing unit shall be entitled to receive its share of the production of the wells located in the drilling and spacing unit applicable to its interest in the drilling and spacing unit. Township 6 North, Range 64 West, 6th P.M. Section 5: Lot 2, S½NW¼, SW¼ Section 6: Lots 1-4, S½NE¼, SE¼NW¼, E½SW¼, SE¼ [All] Township 7 North, Range 64 West, 6th P.M. Section 31: Lots 1-4, E½W½, E½ [All] Section 32: W½